First is the examination: We do not begin installation until substrates have been properly prepared. If the substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

1. At the time of preparation to start working: We make sure that the surface where the work is taking place is clean thoroughly. We prepare the surfaces using the methods recommended by the manufacturer for achieving the best for the substrate under the project conditions.

2. Start installation: we install under the indicated instructions and drawings. Then, we clean glass and metal surfaces.

3. Explaining the protection: we tell you how to protect the product until the project is complete. Then, there's touch-up, repair and or replace of damaged products before the substantial completion of the project.

Awning Design Gallery Gate Gallery Handrail Gallery Door Gallery

US Door & Railing invites you to come and see our work in our "Stainless Architectural Gallery". We take great pride in the work we put into our Railing Design, Brass Railings and Tempered Glass Railings.